Assigning Severity Ratings to Safety Observation Findings
When conducting traditional risk assessments, severity is commonly used as a factor when determining the level of risk involved. Severity represents the most likely consequence of a particular hazard occurrence. In other words, if a hazard exists and is not mitigated,